Retreat 17cm Mattress HD Foam Concave Coil - King
In stock
SKU
104_11360
$395
PREMIUM QUALITY Crafter Stretch Knit Fabric is Oeko-Tex approved which protects you from dust mites and allergens.
HD foam keeps you safe from harmful substances, dust mites, mould and its hypo-allergenic. It is also resilient and breathable keeping you at a comfortable sleeping temperature
2.3 Concave Coil Inner Spring brings a traditional feel with better support and air circulation to provide maximum comfort.
HD foam keeps you safe from harmful substances, dust mites, mould and its hypo-allergenic. It is also resilient and breathable keeping you at a comfortable sleeping temperature
2.3 Concave Coil Inner Spring brings a traditional feel with better support and air circulation to provide maximum comfort.
Features:
- Premium Quality Fabric
- Eco substance Certified
- Breathable
- High-Density Foam
- 2.3 Concave Coil Inner Spring
- Firmness: SUPER Firm
- Certification: CertiPUR-US and OEKO-TEX
- Thickness:17cm
- Australian Designed
- KING: 183 x 203 x 17cm
Shopping FAQ:
Delivery for this item usually takes between 2 and 7 days, longer delays can be expected for locations outside major capital cities.
You may receive this item is a separate delivery if you are purchasing multiple items at the same time.
You may receive this item is a separate delivery if you are purchasing multiple items at the same time.
Online-Only: This item is not available for Click-&-Collect.
item code: 104_11360
We offer the convenience of choosing from several common payment methods including up-font payments and many popular pay-over-time options in our secure checkout online:
- Credit Card
- PayPal
- Afterpay
- ZipPay
All products are covered by a minimum 12 month warranty for domestic use and come with guarantees that cannot be excluded under the Australian Consumer Law. You are entitled to a replacement or refund for a major failure and compensation for any other reasonably foreseeable loss or damage. You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to a major failure.
(see our Warranty & Returns page for more information.)
(see our Warranty & Returns page for more information.)
Buying for a workplace, a site or a project? Our commercial team can put together one quote for your whole order, and you can mix products from across our range.
Tell us the products, how many of each and your delivery postcode, and we will come back to you with a quote.
(see our Bulk Orders page to request a quote, or call 1300 456 283.)
Tell us the products, how many of each and your delivery postcode, and we will come back to you with a quote.
(see our Bulk Orders page to request a quote, or call 1300 456 283.)

| Price | $395 |
|---|---|
| Condition | New |
| Construction | Concave Coil |
| Size | King |
