Add to Wish List

Retreat 17cm Mattress HD Foam Concave Coil Single

In stock
SKU
104_11362
$265
Credit Card
✔In Stock - Online only
PREMIUM QUALITY Crafter Stretch Knit Fabric is Oeko-Tex approved which protects you from dust mites and allergens.

HD foam keeps you safe from harmful substances, dust mites, mould and its hypo-allergenic. It is also resilient and breathable keeping you at a comfortable sleeping temperature

2.3 Concave Coil Inner Spring brings a traditional feel with better support and air circulation to provide maximum comfort.

Features:

  • Premium Quality Fabric
  • Eco substance Certified
  • Breathable
  • High-Density Foam
  • 2.3 Concave Coil Inner Spring
  • Firmness: SUPER Firm
  • Certification: CertiPUR-US and OEKO-TEX
  • Thickness: 17cm
  • Australian Designed
  • SINGLE: 92 x 188 x 17cm

Shopping FAQ:

Shipping and Delivery

Delivery for this item usually takes between 2 and 7 days, longer delays can be expected for locations outside major capital cities.
You may receive this item is a separate delivery if you are purchasing multiple items at the same time.

Online-Only: This item is not available for Click-&-Collect.

item code:  104_11362

Payments Options

We offer the convenience of choosing from several common payment methods including up-font payments and many popular pay-over-time options in our secure checkout online:
Credit Card
Paypal
Zippay
Afterpay
  • Credit Card
  • PayPal
  • Afterpay
  • ZipPay

Warranty and Returns

All products are covered by a minimum 12 month warranty for domestic use and come with guarantees that cannot be excluded under the Australian Consumer Law. You are entitled to a replacement or refund for a major failure and compensation for any other reasonably foreseeable loss or damage. You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to a major failure.
(see our Warranty & Returns page for more information.)
Live Chat
More Information
Price $265
Condition New
Construction Concave Coil
Size Single